Commencement notice group
Building extension commencement notices — Riverstown
Riverstown, Sligo
1 unique commencement event · latest notified commencement 08 Apr 2016 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 08 Apr 2016
- Latest notice
- 1 unit
- Planning references supplied
- None stated
- Public location
- Riverstown, Sligo
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Riverstown, Sligo
- County
- Sligo
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Demolish two sections of the existing east boundary wall in order to upgrade and widen the existing vehicle entrance and create new ceremonial exit route, including removal of existing pier and reconstruction of pier to 1.45metres high. •Reduce masonry pier on boundary wall between Ard Keeran National School (Scoil Mathona Naofa) and The Church of the Sacred Heart from 2.4metres to 1.45metres high. •Demolish existing toilet block adjacent to North Porch. •Remove trees necessary for the facilitation of the proposed works. •Remove existing ramp to North Porch. •Remove existing steps to south and east porch. •Provide a new ceremonial entrance with a set down area, the provision of new entrance steps and disabled access ramp to East Porch. •Construct extension to North Porch to provide one disabled access WC and one ambulant disabled WC. •Provide new entrance steps and disabled access ramp to South Porch. •Upgrade and increase the car parking area to accommodate 50 car parking spaces. •Improvements and upgrading of existing landscaping and new tree planting. •Improvements and upgrading of existing front boundary gates and basement balustrades on the north elevation. •Alternations to existing footpath and extend existing footpath at roadside boundary to church. •Installation of bollards on pavement to main road and at the front of church. •All ancillary site works at this location
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.