Housing site start — Dublin
Dublin 1, Dublin
1 commencement notice · start date 28 Mar 2023 · planning reference given
Planning 4501/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 28 Mar 2023
- Latest notice
- 3 units
- Planning reference
- 4501/22
- Location
- Dublin 1, Dublin
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
Addresses on the notices
- basement and ground floor level and to residential at first, second and third floor levels to accommodate 3 no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: - Demolition of non-original structures to the rear including rear wall, cantilevered structures and external fire escape stairs; - Construction of 4-storey extension to the rear; - Change of use from public house to retail at basement and ground floor level and to residential at first, second and third floor levels to accommodate 3 no. 1-bed apartments. - Associated internal alterations and repairs to roof; - Reinstatement of fenestration above street level; - New shopfront at street level; - Bin and bicycle storage at ground level accessed from the rear; - All associated site works and services.
Floor area stated for this source: 274 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.