Housing site start — Clane

Clane, Kildare

1 commencement notice · start date 17 Aug 2020 · planning reference given

Planning 19/1406 · Council file · external

View full project timeline

Commencement notices
1
Latest start date
17 Aug 2020
Latest notice
Scale not stated
Planning reference
19/1406
Location
Clane, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Clane, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 19/1406. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The enlargement of the sitting room at the front right hand side of the house with small single storey extensions, alterations to the elevation along the right hand side of the house, comprising the introduction of a high level window, and to the rear elevation with the introduction of a large sliding door, the replacement of the existing roof with a dormer roof, incorporating two dormer windows and seven skylights, and the inclusion of two bedrooms and a bathroom on the dormer floor, some internal modifications, and a proposed detached garage in the rear garden.

Work stated for this notice Scale not stated for this notice.
Planning reference 19/1406

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.