Site start
Building extension site start — Durrow
Durrow, Laois
2 commencement notices · latest start date 30 Jun 2025 · planning references given
Planning 18/639 · Council file · external
- Commencement notices
- 2
- Latest start date
- 30 Jun 2025
- Latest notice
- 489 m²
- Planning references
- 18/639 · 18639
- Location
- Durrow, Laois
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 18/639 Laois County Council
Exact appeal 303848 · Grant permission with revised conditions · 2019-06-24 · Open official case
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Durrow, Laois
- County
- Laois
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Laois County Council planning record Application details, status and decision record for 18/639. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alterations to the previously permitted single-storey side extension and proposed construction of a two-storey ‘Community Hub’ side extension with a single-storey link to the existing Protected Structure; all with associated site works, including landscaping adjoining Patrick St.
Floor area stated for this source: 489 m².
Renovation of and extension to the former Methodist Chapel Durrow Co Laois Phase 1
Floor area stated for this source: 110 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.