Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 19 Aug 2019 · planning reference given
Planning WEB1433/18
- Commencement notices
- 1
- Latest start date
- 19 Aug 2019
- Latest notice
- 1 house
- Planning reference
- WEB1433/18
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- ground floor level and the construction of a 2
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
conversion of the existing garage structure into a granny flat for use ancillary to the main dwelling and will include the replacement of the existing garage door with 2 windows & new window to the rear at ground floor level and the construction of a 2.5sqm first floor extension with matching roof to the east over the existing link corridor
Floor area stated for this source: 2 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.