Site start
Housing site start — Dublin
Dublin 14, Dublin
7 commencement notices · latest start date 26 Jun 2020 · planning reference given
Planning ABP-304590-19
- Commencement notices
- 7
- Latest start date
- 26 Jun 2020
- Latest notice
- 288 m²
- Planning reference
- ABP-304590-19
- Location
- Dublin 14, Dublin
Location
Where the site is
- Area
- Dublin 14, Dublin
- County
- Dublin
Addresses on the notices
- Walled Garden, Gort Mhuire, Dundrum, Dublin 14
- Notice source points are up to 1.5 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.280540, -6.240458 Open point
- Public notice source · 53.293176, -6.246175 Open point
- Public notice source · 53.293176, -6.246175 Open point
- Public notice source · 53.293176, -6.246175 Open point
- Public notice source · 53.293176, -6.246175 Open point
- Public notice source · 53.293176, -6.246175 Open point
- Public notice source · 53.280540, -6.240458 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-304590-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed construction of a Protected Structure- The Amenity Building @ Walled Garden, Gort Mhuire, Dundrum, Dublin 14
Floor area stated for this source: 288 m².
Proposed construction of a ESB Substation @ Walled Garden, Gort Mhuire, Dundrum, Dublin 14.
Floor area stated for this source: 18 m².
Proposed construction of a five-storey residential block (to be known as Block B) comprising 31 no. apartments @ Block B, Walled Garden, Gort Mhuire, Dundrum, Dublin 14
Floor area stated for this source: 2,730 m².
Proposed construction of a five-storey residential block (to be known as Block D) comprising 31 no. apartments @ Block D, Walled Garden, Gort Mhuire, Dundrum, Dublin 14
Floor area stated for this source: 2,730 m².
Proposed construction of a five-storey residential block (to be known as Block C) comprising 27 no. apartments @ Block C, Walled Garden, Gort Mhuire, Dundrum, Dublin 14
Floor area stated for this source: 2,509 m².
Proposed construction of a five-storey residential block (to be known as Block A) comprising 27 no. apartments @ Block A, Walled Garden, Gort Mhuire, Dundrum, Dublin 14
Floor area stated for this source: 2,509 m².
Enabling Works (consisting of installation of site hoarding, site access, site set up, temporary site facilities and services) ahead of construction works at Walled Garden, Gort Mhuire, Dundrum, Dublin 14
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.