Site start

Building extension site start — Sutton

Sutton, Dublin

1 commencement notice · start date 07 Jun 2022 · planning reference given

Planning F22B/0043 · Planning application

View full project timeline

Commencement notices
1
Latest start date
07 Jun 2022
Latest notice
1 unit
Planning reference
F22B/0043
Location
Sutton, Dublin

Location

Where the site is

Area
Sutton, Dublin
County
Dublin

Addresses on the notices

  • first floor level to front
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

(1) The demolition of an existing single storey shed to the rear; (2) the construction of a new single storey extension to the rear; (3) modification to existing opes to the front and rear to suit new internal arrangements; (4) replacement of external doors and windows throughout; (5) the introduction of a modest terrace at first floor level to front; (6) the installation of solar panels to the front; (7) reconfiguration of existing porch to front; and (8) the construction of a single storey garden office to the rear of the existing garden. External works will consist of (9) the replacement of existing gates at the vehicular and pedestrian entrances to the site, and all other associated site works necessary to facilitate the development.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 29 m².

Planning reference F22B/0043

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.