Commencement notice group

Building extension commencement notices — Killiney

Killiney, Dublin

1 unique commencement event · latest notified commencement 10 Oct 2025 · planning reference supplied

Unique commencement events
1
Latest notified commencement
10 Oct 2025
Latest notice
1 unit
Planning references supplied
D23A/0740
Public location
Killiney, Dublin

Planning-anchored public geography

Site identity and location

Canonical public locality
Killiney, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0134223DR BCMS open-data feed

) Demolition of existing single storey extension to rear, 2) construction of a 2-storey extension to rear including roof terrace and privacy screen at upper ground floor level, 3) alterations to existing driveway, including widening of existing vehicular access 4) replacement of non-original asbestos roof to outhouse structure at lower ground floor, 5) new bike store in front garden, 6) repointing of original brickwork and necessary repairs to brick chimneys and existing timber joinery, 7) new double glazed windows to match existing, and all associated site works

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 204 m².

Planning reference D23A/0740

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.