Building extension site start — Letterkenny

Letterkenny, Donegal

1 commencement notice · start date 09 May 2022 · planning reference given

Planning 2151850 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
09 May 2022
Latest notice
3,620 m²
Planning reference
21/51850
Location
Letterkenny, Donegal

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Completion certificate recorded — source scope not stated Donegal County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-05 2 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Letterkenny, Donegal
County
Donegal
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Donegal County Council planning record Application details, status and decision record for 21/51850. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

1. Rooftop Retrofit Works Works will be for the deep retrofit of a 1,200sq.m rooftop extension to the main educational building on the Letterkenny Campus. The extension is a light weight steel structure constructed over the pre-existing RTC 'H' block wing. The wall type is 200mm block with 50mm insulation and Glasal rain screen panels; The roof construction is steel profile sheeting; The floor construction is 150mm concrete slab with 50mm screed supported by steel beams over 500mm void over the 1970's RTC roof. It is proposed to increase the roof & wall insulation, renew the roof membrane, rain screen cladding, windows & rooflights. Lighting & heating systems are to be upgraded including provision of PV panels to the roof. 2. Retrofit Works to Single Storey Block (former BIC Block) The works will be for the medium retrofit of a 455 sq.m single storey block to the rear (north) on main LYIT building. The walls are standard blockwork masonry construction. It is proposed to increase the roof & wall insulation, renew the roof membrane, windows. Lighting & heating systems are to be upgraded. Works involve temporary relocation of existing teaching gas storage. These works are subject to confirmation of funding. 3. Construction of new build Biomass Heat Centre. Works to include construction of new stand alone 200 sq.m enclosure to house new biomass boilers and associated plant and equipment and fuel stores. The centre, to be located close to the western boundary of the campus will provide heating to the LYIT Campus. Works will include construction of piled foundation, floor slab with 2 No. fuel storage pits, external envelope and associated flues. 4. District Heating / Site Services Works include provision of new services trenches, one trench shall be approx. 150m long and run along the car park to the north side of the main LYIT building. The trench will contain district heating pipework to deliver hot water generated in the Biomass Heat Centre to the existing heating dist

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,620 m².

Planning reference 21/51850

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.