Site start

Building extension site start — Walkinstown

Walkinstown, Dublin

1 commencement notice · start date 26 Oct 2015 · planning reference given

Planning SD15B/0149 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
26 Oct 2015
Latest notice
1 unit
Planning reference
SD15B/0149
Location
Walkinstown, Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Walkinstown, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD15B/0149. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

'Opt Out' New Bay Windows and canopy over to the front with an extended entrance at ground floor, revised window locations at first floor to the front and existing hipped and parapet roof profile revised to extend across front elevation, demolish existing single storey rear extension and construct new single storey rear extension at ground level. Revised window locations at first floor to the rear and existing hipped and parapet roof profile revised to form a new dormer type attic conversion at rear with existing side gable wall elevation revised to suit, existing driveway entrance width revised with all associated works.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference SD15B/0149

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.