Site start

Housing site start — Dublin

Dublin

1 commencement notice · start date 28 Feb 2020 · planning reference given

Planning F18A/0634 · Planning application

View full project timeline

Commencement notices
1
Latest start date
28 Feb 2020
Latest notice
1 house
Planning reference
F18A/0634
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of new 2 storey detached dwelling with new vehicular entrance off Balkill Road and all associated site works. Proposed dwelling to provide 4 bedrooms, utility and studio on accessible Ground Floor, with open plan living area, shower room and separate sitting room on First Floor level.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 248 m².

Planning reference F18A/0634

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.