Site start
Building extension site start — Celbridge
Celbridge, Kildare
1 commencement notice · start date 14 Nov 2017 · planning reference given
Planning 17/673 · Council file · external
- Commencement notices
- 1
- Latest start date
- 14 Nov 2017
- Latest notice
- 1 unit
- Planning reference
- 17/673
- Location
- Celbridge, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 17/673 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Celbridge, Kildare
- County
- Kildare
Addresses on the notices
- attic level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 17/673. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed attic conversion with 3 no. dormer windows, 1 no. velux roof light in the front slope of the roof and 1 no. dormers window, 2 no. velux roof lights in the rear slope of the roof at attic level. Construction of new entrance porch and ridge and wall plate to be risen. Extension to the rear (20m2) with 4 no. of velux roof lights at ground level. Modifications of existing windows to the front and new windows to the rear and side elevations. Proposal for lowering of front boundary walls and piers and all associated ground and site works at “Jaro”, Maynooth Road, Celbridge, Co. Kildare – Michael & Olivia Duggan – 17/673.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.