Commencement notice group
Building extension commencement notices — Dublin
Dublin 6, Dublin
1 unique commencement event · latest notified commencement 13 Apr 2026 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 13 Apr 2026
- Latest notice
- 230 m²
- Planning references supplied
- None stated
- Public location
- Dublin 6, Dublin
Public source geography
Site location
- Public site / locality
- Dublin 6, Dublin
- County
- Dublin
Public site labels seen across the notices
- ground floor
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The development will consist of: (i) demolition of existing 33m2 single-storey non-original extension (approved under Reg. Ref. 3234/14) and construction of new 51 m2 single storey extension to the rear, (ii) Internal alterations to include: unblocking of original internal door at ground floor; the removal of non-original partitions at first floor and relocation of one door; the widening of a non-original window to the return at 2nd floor, the addition of a flight of stairs to the attic, and conversion of the existing attic space at second floor level to provide for additional storage, and construction of a dormer window to rear at second floor level, (iii) provision of 4 no. additional roof lights (located in the valley between the west slope of the main roof and the east slope of the return), (iv) the installation of 4 no. solar panels (located in the valley between the west slope of the main roof and the east slope of the return) to the rooftop of the existing dwelling, (v) the provision of bicycle storage, bin store, and storage within the front garden, and (vi) construction of new 18m2 garden building, for storage, office and recreational use ancillary to main house. The development includes all ancillary site works, inclusive of boundary treatments, landscaping and SuDS drainage, necessary to facilitate the development.
Floor area stated for this source: 230 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.