Site start
Site start — Shannon
Shannon, Clare
1 commencement notice · start date 22 Aug 2024 · planning reference given
Planning P21/576
- Commencement notices
- 1
- Latest start date
- 22 Aug 2024
- Latest notice
- 1,318 m²
- Planning reference
- P21/576
- Location
- Bóthar Linne, Shannon, Clare
Location
Where the site is
- Area
- Shannon, Clare
- County
- Clare
Addresses on the notices
- Bóthar Linne, Shannon, Clare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: (i) Construction of a new single storey Primary School (1,318m²), new internal road with set-down area and car parking, covered bicycle parking and entrance gate, new site boundaries, hard play area, landscaping and all associated site works on a site area of 1.94 acres, (ii) new site entrance from Bealach Brí, (iii) new bus set down, adjacent to new entrance, on Bealach Brí and associated road works at the junction of the proposed site entrance, (iv) Removal of 5no. existing temporary prefabricated classrooms granted planning under 16/301 and retention of pre-school modular cabin granted planning under 17/296
Floor area stated for this source: 1,318 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.