Commencement notice group
Commercial commencement notices — Athy
Athy, Kildare
1 separate notice · latest notified commencement 21 Jan 2019 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 21 Jan 2019
- Latest notice
- 417 m²
- Planning references supplied
- 18856
- Public location
- Athy, Kildare
Public source geography
Site location
- Public site / locality
- Athy, Kildare
- County
- Kildare
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Kildare County Council · reference 18856 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
alterations and a two-storey extension (310sqm) with eight en-suite bedrooms; a single storey office and beauty treatment room extension (84sqm) and a single storey chair store extension (23sqm) and the provision of all other associated site excavation, infrastructural and site development works above and below ground
417 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.