Site start
Housing site start — Ballydehob
Ballydehob, Cork
2 commencement notices · latest start date 06 Aug 2025 · no planning reference given
Planning Part 8 Consultation
- Commencement notices
- 2
- Latest start date
- 06 Aug 2025
- Latest notice
- 2 houses
- Planning references
- None given
- Location
- Ballydehob, Cork
Location
Where the site is
- Area
- Ballydehob, Cork
- County
- Cork
Addresses on the notices
- Goleen, Cork
- Teach an Stáisiún, Goleen, Co
- Radharc na Scol, Greenmount Rd
- Notice source points are up to 19.0 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 51.491797, -9.711512 Open point
- Public notice source · 51.560533, -9.460546 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
change of use & material alterations to the former Goleen Garda station to 2 no. dwellings (no's 1 & 2) at Teach an Stáisiún, Goleen, Co. Cork.
Floor area stated for this source: 145 m².
Construction of 2 no. two storey buildings for 12 apartments (No.'s 1-12) at Radharc na Scol, Greenmount Rd., Ballydehob, Co. Cork.
Floor area stated for this source: 849 m².
Source unit value with scope not stated: 12 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.