Commencement notice group

Housing commencement notices — Newbridge

Newbridge, Kildare

4 unique commencement events · latest notified commencement 14 Dec 2016 · planning reference supplied

Unique commencement events
4
Latest notified commencement
14 Dec 2016
Latest notice
4 houses
Planning references supplied
13/844
Public location
Newbridge, Kildare

Planning-anchored public geography

Site identity and location

Canonical public locality
Newbridge, Kildare
County
Kildare

Notice location variants

  • Crotanstown Grange, Green Road, Newbridge, Co CN0022891KE, CN0014672KE, CN0006950KE
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0022891KE BCMS owner-supplied export

erection of 20 no. two storey, three bedroom dwellings (type Y) and associated drainage and site works in lieu of 13no. (type G) four bedroom dwellings which were previously granted under planning no. 12/295 extension of duration of permission of 07/124, which in turn was permission to complete and retain changes to planning nos. 06/139 and 04/867 at Crotanstown Grange, Green Road, Newbridge, Co. Kildare

Work stated for this notice 4 houses Explicit notice quantity stated by the source.
Planning reference 13/844 Builder stated: Pme Donnelly Ltd Developer stated: Pme Donnelly Ltd
CN0014672KE BCMS open-data feed

erection of 20 no. two storey, three bedroom dwellings (type Y) and associated drainage and site works in lieu of 13no. (type G) four bedroom dwellings which were previously granted under planning no. 12/295 extension of duration of permission of 07/124, which in turn was permission to complete and retain changes to planning nos. 06/139 and 04/867 at Crotanstown Grange, Green Road, Newbridge, Co. Kildare.

Work stated for this notice 4 houses Explicit phase quantity stated by the source.
Planning reference 13/844
CN0006950KE BCMS open-data feed

erection of 20no. two storey, three bedroom dwellings (type Y) and associated drainage and site works in lieu of 13no. (type G) four bedroom dwellings which were previously granted under planning no. 12/295 extension of duration of permission of 07/124, which in turn was permission to complete and retain changes to planning nos. 06/139 and 04/867 at Crotanstown Grange, Green Road, Newbridge, Co. Kildare.

Work stated for this notice 6 houses Explicit phase quantity stated by the source.
Planning reference 13/844
CN0001075KE BCMS owner-supplied export

The development will consist of the erection of 20no. Two storey, three bedroom dwellings (type Y) and associated drainage and site works in lieu of 13no. ( type G) four bedroom dwellings which were previously granted under planning no. 12/295 extension of duration of permission of 07/124, which in turn was permission to complete and retain changes to planning no.s 06/139 and 04/867.

Work stated for this notice 6 houses Explicit notice quantity stated by the source.
Planning reference 13/844 Builder stated: Pme Donnelly Ltd Developer stated: Pme Donnelly Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.