Site start

Building extension site start — Santry

Santry, Dublin 9, Dublin

1 commencement notice · start date 22 Aug 2018 · planning reference given

Planning 2930/18

Commencement notices
1
Latest start date
22 Aug 2018
Latest notice
29 m²
Planning reference
2930/18
Location
Santry, Dublin 9, Dublin

Location

Where the site is

Area
Santry, Dublin 9, Dublin
County
Dublin

Addresses on the notices

  • rere and all associated site works
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Full Development Description RETENTION & PERMISSION: Permission to retain existing partially completed structure and permission to complete construction of a detached single storey hobby room/garden store at rere and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 29 m².

Planning reference 2930/18

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.