Site start
Housing site start — Rathmines
Rathmines, Dublin
1 commencement notice · start date 19 Jul 2017 · planning reference given
Planning 2268/17
- Commencement notices
- 1
- Latest start date
- 19 Jul 2017
- Latest notice
- Scale not stated
- Planning reference
- 2268/17
- Location
- Rathmines, Dublin
Location
Where the site is
- Area
- Rathmines, Dublin
- County
- Dublin
Addresses on the notices
- No
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development at No.20 Ormond Road South, Rathmines, Dublin – a Protected Structure. The development will consist of the following works to the two / three storey dwelling: - Demolition of single-storey extension to rear; - Construction of a new single storey extension with 2no linear roof lights to the rear; - Construction of 3no. new conservation roof-lights at attic level in the main roof to rear; - Rear and side elevation changes to include construction of 2no. new windows to the side passageway; - Refurbishment and internal amendments to the existing dwelling on all levels to include new staircase to proposed converted attic space; - All associated conservation and repair work, landscaping to front and rear gardens, drainage and site development works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.