Building extension site start — Ballyhale

Ballyhale, Kilkenny

1 commencement notice · start date 05 May 2017 · planning reference given

Planning 16/41 · Council file · external

Commencement notices
1
Latest start date
05 May 2017
Latest notice
Scale not stated
Planning reference
16/41
Location
Ballyhale, Kilkenny

Location

Where the site is

Area
Ballyhale, Kilkenny
County
Kilkenny
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development will consist of and permission/retention permission is sought for: retention of an existing quarry with an extraction area of approximately 1.20 ha. A lateral extension to the quarry with a proposed extraction area of approximately 0.80ha. Processing of the extracted rock using mobile crushing and screening equipment. Sale off site of the processed aggregate. Installation of wheel cleaning system. All ancillary operations. The amount of material to be extracted is approximately 200,000 tonnes in total and permission is sought for a period of 15 years. All within an application area of c.2.9 ha

Work stated for this notice Scale not stated for this notice.
Planning reference 16/41

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.