Site start
Housing site start — Dublin
Rathmines Dublin 6, Dublin
1 commencement notice · start date 10 Mar 2023 · no planning reference given
Planning 4054/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 10 Mar 2023
- Latest notice
- 292 m²
- Planning references
- None given
- Location
- Rathmines Dublin 6, Dublin
Commencement and completion records
Planning, start and completion
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Planning applications
- Links to official records
- 0
- Links between applications
- Repeat copies merged
- Completion certificates
Location
Where the site is
- Area
- Rathmines Dublin 6, Dublin
- County
- Dublin
Addresses on the notices
- ground and first floor and replacement of non-original uPVC windows and doors
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Alteration and extensions to the existing dwelling, as follows: (i) Demolition of single storey pitched roof uPVC conservatory (31.3 sq.m.) and non-original single storey flat roofed utility room extension (10.2 sq.m); (ii) Demolition of 2 no. chimneys and single storey flat roofed garage (including en-suite serving ground floor bedroom) (18.5 sq. m.); (iii) Construction of part single storey part two storey extension to the side and rear (126.3sqm); (iv) Alterations and modifications including new stairs, reconfiguration of internal room layouts at ground and first floor and replacement of non-original uPVC windows and doors; (v) Widening of existing vehicular entrance to 3.8m, a new masonry wall in the rear garden and associated landscaping; and, (vi) The development also includes SuDS drainage and all ancillary and engineering works necessary to facilitate the development.
Floor area stated for this source: 292 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.