Site start
Building extension site start — Ballina
Ballina, Mayo
2 commencement notices · latest start date 18 Nov 2021 · planning reference given
Planning P21/145
- Commencement notices
- 2
- Latest start date
- 18 Nov 2021
- Latest notice
- 15 m²
- Planning reference
- P21/145
- Location
- Ballina, Mayo
Location
Where the site is
- Area
- Ballina, Mayo
- County
- Mayo
- Notice source points are up to 10.4 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 54.114948, -9.155069 Open point
- Public notice source · 54.021859, -9.173111 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a single storey detached shed.
Floor area stated for this source: 15 m².
Ground and first floor extension to the existing dwellinghouse.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.