Site start
Site start — Dublin
Dublin 4, Dublin
2 commencement notices · latest start date 27 Dec 2023 · planning reference given
Planning ABP-310299-21
- Commencement notices
- 2
- Latest start date
- 27 Dec 2023
- Latest notice
- 30 m²
- Planning reference
- ABP-310299-21
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-310299-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposed ESB substation and switch room building will be a standalone single-storey building comprising an internal floor area of approx. 26.5m2 which will be split into two separate compartments, (i.e. the substation and switch room).
Floor area stated for this source: 30 m².
Demolition of Maxol Filling Station and a vacant motor sales/service garage (formerly Michael Grant Motors), Beach Road, Dublin 4
Floor area stated for this source: 1,200 m².
Source unit value with scope not stated: 120 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.