Site start

Building extension site start — Dublin

Dublin

2 commencement notices · latest start date 17 Jul 2026 · planning reference given

Planning D25A/0222/WEB · Planning application

View full project timeline

Commencement notices
2
Latest start date
17 Jul 2026
Latest notice
96 m²
Planning reference
D25A/0222/WEB
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin

Addresses on the notices

  • Ground Floor level and 34sqm at First Floor level ) comprising of a kitchen, utility, dining, living, bedroom & bathroom space
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Works to Protected Structures (no.908) : consisting of the demolition of an existing two storey rear & side extension of 33sqm and adjacent shed buildings and its replacement with a new two storey rear & side extension of 96sqm ( 62sqm at Ground Floor level and 34sqm at First Floor level ) comprising of a kitchen, utility, dining, living, bedroom & bathroom space; the upgrading of mechanical and electrical installations throughout both adjoining properties, upgrade of flooring to new floor slab throughout, new bathrooms & kitchens, new layout works, internal restoration & redecoration works, a new western side window at first floor level of 'The Manse', reroofing & repairs of existing roof profiles of both properties, associated landscape and drainage works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 96 m².

Planning reference D25A/0222/WEB
Notice 2 Commencement notice

Works to Protected Structures (no.908) : consisting of the demolition of an existing two storey rear & side extension of 33sqm and adjacent shed buildings and its replacement with a new two storey rear & side extension of 96sqm ( 62sqm at Ground Floor level and 34sqm at First Floor level ) comprising of a kitchen, utility, dining, living, bedroom & bathroom space; the upgrading of mechanical and electrical installations throughout both adjoining properties, upgrade of flooring to new floor slab throughout, new bathrooms & kitchens, new layout works, internal restoration & redecoration works, a new western side window at first floor level of 'The Manse', reroofing & repairs of existing roof profiles of both properties, associated landscape and drainage works, at the adjoining properties and protected structures of 'The Manse' & 'The Annex' , York Road, Dún Laoghaire, Co. Dublin

Work stated for this notice 2 units Explicit phase quantity stated by the source.

Floor area stated for this source: 389 m².

Planning reference D25A/0222/WEB

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.