Site start
Intel campus — site start
Collinstown Industrial Park, Kildare
2 commencement notices · latest start date 22 Jul 2019 · planning references given
Planning 16/1229 PL09.248582
- Commencement notices
- 2
- Latest start date
- 22 Jul 2019
- Latest notice
- 61,200 m²
- Planning references
- 16/1229 · PL09.248582
- Location
- Collinstown Industrial Park, Kildare
Location
Where the site is
- Area
- Collinstown Industrial Park, Kildare
- County
- Kildare
Addresses on the notices
- Leixlip, Kildare
- Notice source points are up to 596 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.371103, -6.530269 Open point
- Public notice source · 53.375878, -6.526195 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for PL09.248582. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a Four-storey open- sided carpark with roof parking, within the existing Intel campus in Leixlip, Co. Kildare.
Floor area stated for this source: 61,200 m².
Works to facilitate a Manufacturing Building on the Intel Collinstown Campus.
Floor area stated for this source: 199,773 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.