Site start

Housing site start — Dublin

Dublin

1 commencement notice · start date 10 Jun 2026 · planning references given

Planning SD25A/0116W SD25A/0274W

Commencement notices
1
Latest start date
10 Jun 2026
Latest notice
14 units
Planning references
SD25A/0116W · SD25A/0274W
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Two additional floors of 14 additional apartments, on an apartment block varying in height between 5 & 6 stories and now comprising 43no. units in total (25no. one bed units and 18no. two bed units.

Work stated for this notice 14 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,208 m².

Planning reference SD25A/0116W Planning reference SD25A/0274W Developer stated: Kavco Group

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.