Housing site start — Ranelagh

Ranelagh, Dublin

1 commencement notice · start date 25 Nov 2025 · planning reference given

Planning 3041/25 · Planning application

View full project timeline

Commencement notices
1
Latest start date
25 Nov 2025
Latest notice
183 m²
Planning reference
3041/25
Location
Ranelagh, Dublin

Location

Where the site is

Area
Ranelagh, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

PROTECTED STRUCTURE: the development will consist/consists of : refurbishment and alteration of existing two-storey terraced house to include : (1) the demolition of the existing lean-to single-storey kitchen to the rear of the building and removal of existing window to the rear for installation of a new door, (2) the construction of a new single-storey extension to the rear of the building, (3) the erection of a new timber shed in rear garden, (4) the replacement of all external windows at the rear with new timber windows, (5) the erection of 10 m2 of solar PV panels to the rear slope of main roof and 7m2 to the return roof , (6) replacement of 3 no existing sash windows on front facade with new timber double glazed sash units, (7) alteration to existing first floor en-suite bathroom, (8) alteration to existing attic room incl. 4 no larger velux rooflights replacing existing, (9) construction of timber bike & bin store in front garden.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 183 m².

Planning reference 3041/25

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.