Site start

Commercial site start — Rush

Rush, Dublin

1 commencement notice · start date 05 Aug 2025 · planning reference given

Planning F24A/0367E · Planning application

View full project timeline

Commencement notices
1
Latest start date
05 Aug 2025
Latest notice
389 m²
Planning reference
F24A/0367E
Location
Rush, Dublin

Location

Where the site is

Area
Rush, Dublin
County
Dublin

Addresses on the notices

  • ground level and staff facilities and storage at first floor level
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The development will consist of a two storey extension to the rear of the existing building with a flat roof and rooflights. It will include extended retail and pharmacy uses at ground level and staff facilities and storage at first floor level. It will also include a single storey extension to the rear with boiler, plant room and refuse storage. The façades to the side will include minor modifications. The development will include all associated site works and services.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 389 m².

Planning reference F24A/0367E

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.