Site start
Commercial site start — Newcastle West
Newcastle West, Limerick
1 commencement notice · start date 18 Mar 2021 · planning reference given
Planning 16906 · Council file · external
- Commencement notices
- 1
- Latest start date
- 18 Mar 2021
- Latest notice
- 2,789 m²
- Planning reference
- 16906
- Location
- Newcastle West, Limerick
Location
Where the site is
- Area
- Newcastle West, Limerick
- County
- Limerick
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. The construction of a two storey extension to the existing manufacturing building, with mezzanine level office areas, associated elevational changes and a roof plant area. 2. Increase to the existing mezzanine area. 3. The construction of a single storey utility building including an ESB substation. 4. The construction of a service yard to include cooling tower, storage and wastewater tanks, storage shed and pipe bridge. 5. Associated site works and car parking including a perimeter fence and landscaping. 6. Provision of illuminated signage on the front elevation of the building.
Floor area stated for this source: 2,789 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.