Site start
Housing site start — Raheny
Raheny, Dublin
1 commencement notice · start date 02 Jun 2015 · planning reference given
Planning 3816/14
- Commencement notices
- 1
- Latest start date
- 02 Jun 2015
- Latest notice
- 1 house
- Planning reference
- 3816/14
- Location
- Raheny, Dublin
Location
Where the site is
- Area
- Raheny, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of existing single-storey garden shed/ storage to rear open space and construction of proposed single-storey family room and studio/ workshop (with rooflights to pitched roofs over), new low-level parapet wall and alterations to existing roof finishes to new/ existing roof along boundary with adjacent property to rear of existing 4 bedroom three storey, mid-terraced dwelling with minor internal alterations to include provision of new wc facilities, utility room and play room, proposed low pitch lean-to roof over existing front porch/ canopy and alterations to existing brickwork facade to include new painted render finish to front elevation, minor alterations to width of existing vehicular access and dished kerb to front boundary and all associated site, landscaping and drainage works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.