Commencement notice group
Belin Woods — commencement notices
Newbridge, Kildare
10 separate notices · latest notified commencement 21 Oct 2021 · planning reference supplied
- Source notices
- 10
- Latest notified commencement
- 21 Oct 2021
- Latest notice
- 24 units
- Planning references supplied
- ABP-302141-18
- Public location
- Newbridge, Kildare
Public source geography
Site location
- Public site / locality
- Newbridge, Kildare
- County
- Kildare
Public site labels seen across the notices
- Belin Woods, Newbridge, County Kildare
- Kilbelin, Newbridge, County Kildare
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of Apartment Block E (24 units) and all infrastructure and associated site works at Belin Woods, Newbridge, County Kildare
24 units · 2,016 m² · stated on this notice
Construction of 34 No. Dwellings and 1 No. Maisonette Block and all infrastructure and associated site works at Belin Woods, Newbridge, County Kildare
60 homes · 3,972 m² · stated on this notice
Construction of Apartment Block D (24 units) and all infrastructure and associated site works at Belin Woods, Newbridge, County Kildare
60 units · 2,016 m² · stated on this notice
Construction of 89 No. Dwellings and all infrastructure and associated site works at Belin Woods, Newbridge, County Kildare
89 homes · 10,292 m² · stated on this notice
Construction of 61 No. Dwellings and 1 No. Maisonette Block and all infrastructure and associated site works at Belin Woods, Newbridge, County Kildare
61 homes · 6,578 m² · stated on this notice
Construction of 52 No. Dwellings and 1 No. Maisonette Block and all infrastructure and associated site works at Belin Woods, Newbridge, County Kildare
53 homes · 5,853 m² · stated on this notice
1-25 The View (25 Dwellings), Belin Woods, Newbridge, County Kildare
25 homes · 2,823 m² · stated on this notice
1-18 The Heights (18 Dwellings), Belin Woods, Newbridge, County Kildare
18 homes · 2,094 m² · stated on this notice
16-19 The Rise (4 Dwellings), Belin Woods, Newbridge, County Kildare
60 homes · 461 m² · stated on this notice
Construction of Creche within the development at Kilbelin, Newbridge, County Kildare
587 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.