Site start
Housing site start — Dublin
Dublin 8, Dublin
2 commencement notices · latest start date 27 Jan 2026 · planning references given
Planning SHD0031/20 (ABP 308917-20)
- Commencement notices
- 2
- Latest start date
- 27 Jan 2026
- Latest notice
- 287 units
- Planning references
- SHD0031/20 · ABP-308917-20
- Location
- Dublin 8, Dublin
Reviewed planning, commencement and document evidence
- Commencement identities
- 2 retained separately
- Latest group date
- 27 Jan 2026 not assigned across events
- Maximum on one notice
- 287 units never summed
- Reviewed index
- 0 0 exact document links
Planning and appeal references
- Appeal ABP-308917-20 Exact dated record link unavailable in this reviewed source
Every retained commencement event
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
Exact organisation roles
- Dublin City CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
- An Coimisiún PleanálaAppealauthority · One or more appeal references are retained.
Location
Where the site is
- Area
- Dublin 8, Dublin
- County
- Dublin
Addresses on the notices
- the Former Player Wills Site South Circular Road Dublin 8
- the former Player Wills site, South Circular Road, Donore Ave, Dublin 8
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-308917-20. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development consists of a mixed-use scheme involving change of use, refurbishment, modifications, alterations and additions to the former Player Wills Factory building (PW1) to include a community, arts and cultural exhibition space, artist and photography studios, retail space, café/bar/restaurant space, co-working space, 240 no. single occupancy shared accommodation private living areas, 47 no. build-to rent apartments, associated ancillary services, amenities and facilities, communal amenity outdoor space and a basement to accommodate plant at the Former Player Wills Site South Circular Road Dublin 8
Floor area stated for this source: 17,604 m².
The demolition of all buildings (15,454 sq.m GFA), excluding the original fabric of the former Player Wills Factory (protected structure no. 8796) to facilitate the development of a mixed use scheme at the former Player Wills site, South Circular Road, Donore Ave, Dublin 8
Floor area stated for this source: 108,178 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.