Site start
Housing site start — Finglas
Finglas, Dublin
1 commencement notice · start date 19 Mar 2019 · planning reference given
Planning 3877/17
- Commencement notices
- 1
- Latest start date
- 19 Mar 2019
- Latest notice
- 70 units
- Planning reference
- 3877/17
- Location
- Finglas, Dublin
Location
Where the site is
- Area
- Finglas, Dublin
- County
- Dublin
Addresses on the notices
- roof level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed residential development to consist of: i) 2 separate apartment building blocks ranging in height from 3 to 6 storeys, comprising a total of 70 no. apartment units including (a) 19 no. 1 bed units, (b) 40 no. 2 bed units; and (c) 11 no. 3 bed units; ii) Renewable energy design measures externally to the building at roof level; iii) 1620 sq.m public open space and associated perimeter fencing; iv) 850 sq.m communal open space; v) 108 no. car parking spaces; vi) vehicular access to the site shall be from Scribblestown Lane with vehicular access from Scribblestown Road to accommodate emergency and maintenance vehicles only; vii) realignment of the existing Scribblestown Park Road and its junction with Scribblestown Road; viii) Widening and upgrade works to Scribblestown Lane to provide for access and on-street car parking; ix) underground surface water attenuation; x) ESB substation; xi) temporary construction signage; xii) estate signage; xiii) provision of wall and railing boundary treatment to perimeter of apartment complex; and xiv) all associated site works.
Floor area stated for this source: 11,930 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.