Site start
Building extension site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 03 Apr 2026 · planning reference given
Planning D24A/0706/WEB · Planning application
- Commencement notices
- 1
- Latest start date
- 03 Apr 2026
- Latest notice
- 1 unit
- Planning reference
- D24A/0706/WEB
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(i) Demolition of one existing chimney (ii) Construction of a new part 2 storey, part single storey extension to the rear (iii) Conversion of the attic to a habitable space and introduction of 1 dormer window to the rear (iv) conversion of the existing garage space to a habitable space and replacement of existing garage door with a new bay window (v) Introduction of 1 velux windows and a first floor window to the side elevation (vi) Construction of a bike and bin store to the front garden (vii) widening of the existing entrance gate onto The Rise (viii) construction of a single storey garden room to the rear garden (ix) alterations to all elevations, associated landscaping and all ancillary works necessary to facilitate development.
Floor area stated for this source: 306 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.