Site start
Housing site start — Kinvarra
Kinvarra, Galway
4 commencement notices · latest start date 16 May 2022 · planning references given
Planning 19/52 (ABP 304064-19), 20/1753
- Commencement notices
- 4
- Latest start date
- 16 May 2022
- Latest notice
- 6 houses
- Planning references
- 19/52 · 20/1753 · ABP-304064-19
- Location
- Kinvarra, Galway
Reviewed planning, commencement and document evidence
Exact project story for 201753 under Galway County Council, retaining 4 separate commencement identities.
- Commencement identities
- 4 retained separately
- Latest group date
- 2022-05-16 not assigned across events
- Maximum on one notice
- 27 units never summed
- Reviewed index
- 5 5 exact document links
- Permitted scale
- 1 units permission record; not summed with notices
Planning and appeal references
- Planning_Application 201753 Open exact official record
Every retained commencement event
- 2021-04-30 Commencement notice 27 units on this event · 30155 m² on this event Official public source URL unavailable in the reviewed projection
- 2021-10-29 Commencement notice 6 units on this event · 2585 m² on this event
- 2022-02-16 Commencement notice 6 units on this event · 2329 m² on this event
- 2022-05-16 Commencement notice 6 units on this event · 1396 m² on this event
Exact organisation roles
- Galway County CouncilPlanningauthority · Exact official planning record 201753.
Explicit facts with official citations
Each statement keeps its exact reference, official title or drawing-title locator, and review state.
- Planningoutcome Planning outcome recorded as CONDITIONAL. 201753 · Official planning record — 201753 · Decision field · exactauthorityreferencerecord Open official evidence
- Permittedscale Permitted scale record states 1 residential units and 3,351 m² floor area. 201753 · Official planning record — 201753 · Residential units and floor-area fields · exactauthorityreferencerecord Open official evidence
- Otherreport Official file index includes “18/03/2021”. 201753 · 18/03/2021 · 18/03/2021 · availablefreshsession Open official evidence
- Otherdrawing Official file index includes “04/12/2020”. 201753 · 04/12/2020 · 04/12/2020 · availablefreshsession Open official evidence
Official document index highlights
Official drawing, report and decision titles retained from an exact authority/reference inventory; the index is not asserted to reproduce the complete authority file.
- Other official report 18/03/2021 Open exact official document
- Other official report 24/11/2020 Open exact official document
- Other official drawing 04/12/2020 Open exact official document
- Other official drawing 04/12/2020 Open exact official document
- Other official drawing Compliance Reply C.11 Open exact official document
Location
Where the site is
- Area
- Kinvarra, Galway
- County
- Galway
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-304064-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 4. Construction of 6 no. dwellings within an overall residential development containing 27 dwellings, associated garden sheds / stores, associated hard & soft landscaped areas and all associated site works and services. The development consists of 2,3,4 & 5 bed dwellings, containing detached and semi-detached dwellings. Phase 4 consists of the construction of dwellings no. 2 & 3 and 24 - 27 inclusive.
Floor area stated for this source: 1,396 m².
Phase 3. Construction of 6 no. dwellings within an overall residential development containing 27 dwellings, associated garden sheds / stores, associated hard & soft landscaped areas and all associated site works and services. The development consists of 2,3,4 & 5 bed dwellings, containing detached and semi-detached dwellings. Phase 3 consists of the construction of dwellings no. 18 - 23 inclusive.
Floor area stated for this source: 2,329 m².
Phase 2 construction of 6 no. dwellings within an overall Residential Development containing 27 dwellings, associated garden sheds / stores, associated hard & soft landscaped areas and all associated site works & services. The development consists of 2,3,4, & 5 bed dwellings, containing detached and semi-detached dwellings. Phase 2 consists of the construction of dwellings no. 12 - 17 inclusive.
Floor area stated for this source: 2,585 m².
Phase 1 construction of 9 no. dwellings within an overall Residential Development containing 27 dwellings, associated garden sheds / stores, associated hard & soft landscaped areas and all associated site works & services. The development consists of 2,3,4 & 5 bed dwellings, containing detached and semi-detached dwellings. Phase 1 consists of the construction of dwellings no.1 & 4 - 11 inclusive.
Source unit value with scope not stated: 27 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.