Site start

Housing site start — Sallins

Sallins, Kildare

1 commencement notice · start date 16 Apr 2026 · planning reference given

Planning 21/889 · Council file · external

View full project timeline

Commencement notices
1
Latest start date
16 Apr 2026
Latest notice
19 m²
Planning reference
21/889
Location
Sallins, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Sallins, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 21/889. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

PERMISSION (a) Modifications to existing dwelling house to include (i) Replacing existing front elevation first floor port hole window with new enlarged rectangular window; (ii) New first floor window to rear elevation; (iii) Minor internal modifications and all associated development works. (b) Modifications to existing domestic shed to include (i) Extending building to provide for home office and games room with w/c; (ii) New window and door arrangement to front and side elevations; (iii) Connection to existing on-site services and all associated development works AT 173 Sallins Bridge, Sallins, Naas, Co. Kildare . IN ACCORDANCE WITH THE PLANS SUBMITTED WITH THE APPLICATION

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 19 m².

Planning reference 21/889

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.