Site start

Housing site start — Dublin

Dublin 4, Dublin

1 commencement notice · start date 25 Mar 2019 · planning reference given

Planning 2809/18

Commencement notices
1
Latest start date
25 Mar 2019
Latest notice
Scale not stated
Planning reference
2809/18
Location
Dublin 4, Dublin

Location

Where the site is

Area
Dublin 4, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

1. Demolition of existing single- storey extension to the side of the property; 2. Construction of a new two-storey extension to either side of the main house; 3. Internal alterations and refurbishment works consisting of the removal of non- original partitions and the creation of new openings between the existing house and new extensions; 4. Provision of new solar panels to the rear slope of the main roof; 5. General repair works and internal remodelling 6. The development will include all associated drainage and site development works

Work stated for this notice Scale not stated for this notice.
Planning reference 2809/18

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.