Site start

Housing site start — Waterfall Road

Waterfall Road, Bishopstown, Cork

11 commencement notices · latest start date 05 Apr 2024 · planning reference given

Planning ABP-310274-21

Commencement notices
11
Latest start date
05 Apr 2024
Latest notice
27 units
Planning reference
ABP-310274-21
Location
Waterfall Road, Bishopstown, Cork

Location

Where the site is

Area
Waterfall Road, Bishopstown, Cork
County
Cork

Addresses on the notices

  • Ardrostig, Waterfall Road, Bishopstown, Cork
  • Waterfall Road, Cork
  • Ardarostig, Waterfall Road, Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-310274-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Construction of a four-storey residential building comprising 27 self-contained apartment units and a ground floor commercial unit at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 8]

Work stated for this notice 27 units Explicit phase quantity stated by the source.

Floor area stated for this source: 2,441 m².

Appeal reference ABP-310274-21
Notice 2 Seven-day notice

Construction of Residential Block (Block 7) which is split into two self-contained but connected Buildings. One Building consisting of a three storey Duplex Block with 4 Ground Floor Apartment and 4 self-contained duplex units above. The second building comprises Four storeys (Ground – Third Floor levels) with 18 apartments at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 7]

Work stated for this notice 26 units Explicit phase quantity stated by the source.

Floor area stated for this source: 2,385 m².

Appeal reference ABP-310274-21
Notice 3 Commencement notice

Construction of 80no residential house units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Unit Nos 1-10, 60-105 & 113-136]

Work stated for this notice 80 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 9,786 m².

Appeal reference ABP-310274-21
Notice 4 Seven-day notice

Construction of a four storey residential building comprising 8 self-contained duplex units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 5]

Work stated for this notice 8 units Explicit phase quantity stated by the source.

Floor area stated for this source: 852 m².

Appeal reference ABP-310274-21
Notice 5 Seven-day notice

Construction of a four storey residential building comprising 8 self-contained duplex units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 3]

Work stated for this notice 8 units Explicit phase quantity stated by the source.

Floor area stated for this source: 852 m².

Appeal reference ABP-310274-21
Notice 6 Seven-day notice

Construction of a four storey residential building comprising 8 self-contained duplex units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 4]

Work stated for this notice 8 units Explicit phase quantity stated by the source.

Floor area stated for this source: 843 m².

Appeal reference ABP-310274-21
Notice 7 Commencement notice

Construction of 28no residential house units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Unit Nos 30-43, 53-59 & 106-112]

Work stated for this notice 28 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 3,422 m².

Appeal reference ABP-310274-21
Notice 8 Seven-day notice

Construction of a 4 storey apartment building at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 2]

Work stated for this notice 18 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,482 m².

Appeal reference ABP-310274-21
Notice 9 Seven-day notice

Construction of a 4 storey apartment building at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 1]

Work stated for this notice 18 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,426 m².

Appeal reference ABP-310274-21
Notice 10 Seven-day notice

Construction of a single storey bin and bike store to serve Apartment Block 1 at Ardrostig, Waterfall Road, Bishopstown, Cork.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 56 m².

Appeal reference ABP-310274-21
Notice 11 Commencement notice

Construction of 28no residential house units at Ardarostig, Waterfall Road, Cork. [Unit Nos 11-29 & 44-52]

Work stated for this notice 28 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 3,331 m².

Appeal reference ABP-310274-21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.