Commencement notice group
Commencement notices — Dunlaoghaire
Dunlaoghaire, Dublin
2 unique commencement events · latest notified commencement 28 Aug 2017 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 28 Aug 2017
- Latest notice
- Scale not stated
- Planning references supplied
- None stated
- Public location
- Dunlaoghaire, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dunlaoghaire, Dublin
- County
- Dublin
Notice location variants
- each floor (circa 14,356
- Dun Laoighre, Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
PROPOSED DEVELOPMENT: Eight-year planning permission for the construction of a new purpose built 120-bed National Rehabilitation Hospital Facility, 3-bed independent living training unit, hydrotherapy unit, sports hall and fitness gym and associated facilities, and all ancillary site development and landscape works. The proposed development will consist of the following: • Construction of new hospital buildings totalling circa 17,834 square metres gross floor area overall, including • A new hospital building entrance (circa 3,002 square metres gross floor area) of three storeys, which includes the new hydrotherapy unit, sports hall and fitness gym. • A new four-storey ward block comprising 120 number single rooms (replacement beds) in a number of discrete wards at each floor (circa 14,356 square metres total gross floor area, with no net change in existing number of hospital beds at the National Rehabilitation Hospital). Plant at roof level. • New three-bed independent living training unit. • A new internal four-storey ‘hospital street’ which runs east-west along the back of the proposed new entrance concourse and provides access to the new wards at each level. The ‘hospital street’ also provides links to the existing National Rehabilitation Hospital buildings at levels 0 and level 1. Minor extension and modifications required to the existing building to allow for these connections. • Extension to the existing building (circa 52 square metres) to provide a classroom, to replace the classroom to be demolished. • Refurbishment works to the existing hospital buildings (circa 259 square metres) associated with the proposed development, including minor fire upgrade works to some existing corridors and provision of temporary fire escapes routes and external stairs (circa 14 square metres) to existing buildings during construction. And all associated and ancillary site development works, including: • Demolition of circa 1,635 square metres of existing hospital related stru
Preparatory works comprising of the provision of a new surface 175 space car-park to facilitate the future removal of existing car-parking to allow for the construction of a new hospital; proposed works consist of line-marked car-parking and access routes, drainage, mechanical and electrical services and some site lighting.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.