Housing site start — Dublin
Dublin
1 commencement notice · start date 24 May 2023 · planning reference given
Planning WEB1938/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 24 May 2023
- Latest notice
- 166 m²
- Planning reference
- WEB1938/22
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- first floor level over existing single storey extension
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extension and alterations of existing semi- detached dwelling. The development will consist of the following principal elements: 1) Construction of a bedroom extension with en-suite and pitched roof to the side at first floor level over existing single storey extension. 2) Alterations to internal layout, elevations and new roof and roof light over the existing single storey rear extension. 3) Attic conversion to storage 4) Increase in width of the existing vehicular entrance to 3.5 m and all associated landscaping and ancillary works.
Floor area stated for this source: 166 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.