Site start
Site start — Ballsbridge
Ballsbridge, Dublin
3 commencement notices · latest start date 18 Jan 2024 · planning reference given
Planning 5001/22 · Planning application
- Commencement notices
- 3
- Latest start date
- 18 Jan 2024
- Latest notice
- 540 m²
- Planning reference
- 5001/22
- Location
- St. Mary's Church, Anglesea Road, Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
Addresses on the notices
- St. Mary's Church, Anglesea Road, Ballsbridge, Dublin
- St Mary's Church, Anglesa Road, Dublin
- St. Mary's Chruch, Anglesa Road, Ballsbridge, Dublin 4
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The works will consist of the removal of the modern blockwork wall within the church nave to facilitate use of the entire original church plan and the reopening of the original door to the north transept.
Floor area stated for this source: 540 m².
Construction of 3 no. WC's in St Mary's Church as well as refurbishment.
Floor area stated for this source: 24 m².
External works only are proposed to the site of St Marys Church. 4 no. openings to be made in the boundary wall between RDS and St Mary's Church with pier supports and gates.
Floor area stated for this source: 563 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.