Site start
Housing site start — Two Mile House
Two Mile House, Naas, Kildare
1 commencement notice · start date 19 Dec 2014 · planning reference given
Planning 14/188 · Council file · external
- Commencement notices
- 1
- Latest start date
- 19 Dec 2014
- Latest notice
- Scale not stated
- Planning reference
- 14/188
- Location
- Two Mile House, Naas, Kildare
Location
Where the site is
- Area
- Two Mile House, Naas, Kildare
- County
- Kildare
Addresses on the notices
- Cluain Ard, Two Mile House, Naas
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Propose to erect an extension and alterations and modifications to an existing one and a half storey dwelling comprising of (1) one and a half storey side extension which will incorporate the existing single storey garage as part of the dwelling (2) single storey front and rear extensions (3) associated alterations to all elevations (4) foul water to existing site effluent treatment system (5) surface water to existing soakaways (6) and all associated site works at Cluain Ard, Two Mile House, Naas
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.