Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 02 Jun 2023 · planning reference given
Planning SD208/0007 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 02 Jun 2023
- Latest notice
- 133 units
- Planning reference
- SD208/0007
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 133 affordable rental apartments with a community facility (c.12,918sq.m) in three blocks ranging from three to eight storeys with associated balconies/ terrace for each apartment and roof mounted solar panels linked by a single storey podium. • Block A (west- c. 5,162sq.m) accommodates 2 studios, 31 1-bed apartments and 28 2-bed apartments. • Block B (east – c 5,903sq.m) accommodates 1 studio, 33 1-bed apartments, 35 2-bed apartments, 1 3-bed apartment and the community facility. • Block C (south – 255sq.m) accommodates 2 3-bed, 3 storey maisonette apartments. • Podium (c.1598sq.m) accommodates 39 car parking spaces which includes 3 universal access spaces, 246 secure bicycle spaces, ESB substation and switch room, plant rooms, bins and other maintenance stores. • Ancillary site development works include the provision of pedestrian zip link/greenway, access roadway, footpaths, 24 bicycle spaces, hard and soft landscaping, new boundary treatments and a landscaped courtyard at podium level on SDCC lands west of the new link road connecting Fourth Avenue and Belgard Square North, Tallaght, Dublin 24.
Floor area stated for this source: 12,918 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.