Site start
Site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 06 Jul 2018 · planning references given
Planning P/1206/18 & P/1258/18
- Commencement notices
- 1
- Latest start date
- 06 Jul 2018
- Latest notice
- 294 m²
- Planning references
- P/1206 · P/1258
- Location
- Rock Hill, Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
Addresses on the notices
- Rock Hill, Blackrock, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Replacing main entrance curtain wall with a new SG curtain wall design including new revolving door. New lifts to replace existing. All existing lobby finishes removed, with modern finishes including new lift surrounds, feature wall , porcelain tile floor and plasterboard ceiling finishes. All doors being removed and replaced, fire doors + WC’s Main staircase to receive new tile floor finish walls painted and new ceiling. Staircase handrail to be changed out to cherry with balustrade to be painted Open Office Areas to receive open ceiling office areas with acoustic treatment to the slab above and bulkhead plaster ceiling at perimeter. Existing raised access floor with new carpet tiles. All sanitaryware, cubicles, and finishes being removed and replaced. Improvements in WC entrance lobbies and de-sign where practicable. Minimum one shower and disabled toilet provided at each level. Full strip of existing M&E system with new full mechanical ventilation system to meet fire and air quality requirements. Roof Finish repaired & replaced. Existing windows removed, and new windows installed.
Floor area stated for this source: 294 m².