Site start
Housing site start — BEAUMONT
BEAUMONT, Cork
1 commencement notice · start date 08 Sep 2025 · planning reference given
Planning 2543860 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 08 Sep 2025
- Latest notice
- 1 house
- Planning reference
- 2543860
- Location
- BEAUMONT, Cork
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 2543860 Cork City Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- BEAUMONT, Cork
- County
- Cork
Addresses on the notices
- GROUND AND FIRST FLOOR LEVEL, (3) DEMOLITION OF AN EXISTING REAR SINGLE STOREY ELEMENT AND GARAGE AND (4) ALL OTHER ASSOCIATED SITE WORKS
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Cork City Council planning record Application details, status and decision record for 2543860. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
ALTERATIONS AND EXTENSIONS TO AN EXISTING DWELLING INCLUDING (1) A PART 2-STOREY (PITCHED ROOF- TO THE SIDE)/ PART SINGLE STOREY (FLAT ROOF- BOTH TO THE FRONT AND REAR) EXTENSION, (2) ELEVATIONAL ALTERATIONS TO THE EXISTING DWELLING INCLUDING A NEW ROOFLIGHT IN THE ATTIC OF THE FRONT FACING MAIN ROOF AND REVISED REAR OPENINGS AT GROUND AND FIRST FLOOR LEVEL, (3) DEMOLITION OF AN EXISTING REAR SINGLE STOREY ELEMENT AND GARAGE AND (4) ALL OTHER ASSOCIATED SITE WORKS.
Floor area stated for this source: 208 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.