Site start
Housing site start — Drumcondra
Drumcondra, Dublin
2 commencement notices · latest start date 01 Feb 2023 · planning reference given
Planning 2930/20 · Planning application
- Commencement notices
- 2
- Latest start date
- 01 Feb 2023
- Latest notice
- 36 units
- Planning reference
- 2930/20
- Location
- Drumcondra, Dublin
Location
Where the site is
- Area
- Drumcondra, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1) Demolition of existing derelict two-storey house, number 198 Clonlife Road, (2) construction of a part three-storey and part four-storey apartment block, forming a new streetscape to Clonliffe Road and to Holy Cross Avenue, to contain 36 apartments (22 one-bedroom apartments, 14 two-bedroom apartments, including two duplex type), with balconies, terraces and other open spaces, ESB substation, internal bin store, basement ancillary services area, and external deck access to each floor.
Floor area stated for this source: 2,610 m².
(1) Demolition of existing derelict two-storey house, number 198 Clonlife Road, (2) construction of a part three-storey and part four-storey apartment block, forming a new streetscape to Clonliffe Road and to Holy Cross Avenue, to contain 36 apartments (22 one-bedroom apartments, 14 two-bedroom apartments, including two duplex type), with balconies, terraces and other open spaces, ESB substation, internal bin store, basement ancillary services area, and external deck access to each floor.
Floor area stated for this source: 2,609 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.