Site start

Site start — Charleville

Charleville, Cork

1 commencement notice · start date 29 Aug 2018 · planning reference given

Planning 17/5644 · Planning application

View full project timeline

Commencement notices
1
Latest start date
29 Aug 2018
Latest notice
280 m²
Planning reference
17/5644
Location
Smiths Lane, Charleville, Cork

Location

Where the site is

Area
Charleville, Cork
County
Cork

Addresses on the notices

  • Smiths Lane, Charleville, Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construct a pitched roof over the existing flat roof classroom block to the front elevation and alterations to front elevation consisting of the removal of timber cladding, dash plaster and to be replaced with new smooth plaster finish

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 280 m².

Planning reference 17/5644

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.