Site start

Housing site start — Whitemore

Whitemore, Wexford

1 commencement notice · start date 24 Apr 2026 · planning reference given

Planning 20251184 · Planning application · Council file · external

Commencement notices
1
Latest start date
24 Apr 2026
Latest notice
186 m²
Planning reference
20251184W
Location
Whitemore, Wexford

Location

Where the site is

Area
Whitemore, Wexford
County
Wexford
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

fully serviced single storey dwelling and domestic garage, septic tank and all associated site works, (being a change of house design from previous granted planning PL 20211734)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 186 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 20251184W

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.