Site start

PE hall — site start

Naas, Kildare

1 commencement notice · start date 02 Nov 2026 · planning reference given

Planning 22/969 · Council file · external

Commencement notices
1
Latest start date
02 Nov 2026
Latest notice
86,960 m²
Planning reference
22/969
Location
3A North Main Street, Naas, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Naas, Kildare
County
Kildare

Addresses on the notices

  • 3A North Main Street, Naas, Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 22/969. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

(1) the phased demolition of existing school buildings (2) the phased construction of a new two and three storey school building with a total gross internal floor area of 10,870m2 incorporating 37no. general classrooms, a series of 20no. support and specialist classrooms, a special needs unit, a library, PE hall, staff rooms and all ancillary accommodation including photovoltaic panels at roof level and separate external storage sheds (50m2) and refuse store (15m2), (2) to allow the school to remain operational during the construction period, the erection on site of new temporary school accommodation units along with the retention and relocation of the existing units and, on completion of construction works, the decommissioning and removal of all temporary school classrooms, (4) the erection, also on a temporary basis during the school construction period, of an airdome (1,050m2) on the proposed school ball courts, to be used for indoor sports use, (5) the school grounds will comprise the retained existing all weather pitch, 6no. ball courts, outdoor seating and breakout areas, sensory gardens, a covered construction store area, hard and soft landscaping throughout with footpaths, public lighting, landscaping and all associated boundary treatments. (6) the existing site access from Sallins Road is to be maintained, while parking and internal movement arrangements are to include modifications to the car and bus drop-off areas, 92no. car parking spaces, inclusive of 5no. disabled spaces and 2no. electric vehicle charge points, 40no. double stacked non sheltered bicycle stands and 85no. sheltered bicycle stands, together providing in total 330no. cycle parking spaces. (7) the proposal also includes new foul and surface water drainage system works incorporating SUDS measures, attenuation, rainwater harvesting, a new substation (28m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds and all other associated site and development works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 86,960 m².

Planning reference 22/969