Site start
Housing site start — Ashbourne
Ashbourne, Meath
21 commencement notices · latest start date 22 Jun 2026 · planning references given
Planning ABP-314550-22 · Planning application
Planning story
Ashbourne / Cherry Lane
- Exact official references
- ABP-314550-22 · SH314550
- Final official decision
- Granted with conditions
- Commencement notices
- 21
- Latest start date
- 22 Jun 2026
No overall constructed, completed-unit or percentage-progress figure is inferred from these notices.
- Commencement notices
- 21
- Latest start date
- 22 Jun 2026
- Latest notice
- 57 units
- Planning references
- ABP-314550-22 · SH314550
- Location
- Ashbourne, Meath
Linked records
Planning, start and completion
- Planning applications
- 2
- Links to official records
- 2
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open official appeal case: ABP-314550-22 An Coimisiún Pleanála · checked 2026-07-30T14:20:00+01:00
- Open exact official planning record: SH314550 Meath County Council · checked 2026-07-30T14:20:00+01:00
Planning SH314550 — · Decision 2023-11-01
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Reviewed planning, commencement and document evidence
- Commencement identities
- 25 retained separately
- Latest group date
- 22 Jun 2026 not assigned across events
- Maximum on one notice
- 247 units never summed
- Reviewed index
- 0 0 exact document links
Planning and appeal references
- Appeal ABP-314550-22 Exact dated record link unavailable in this reviewed source
Every retained commencement event
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
Exact organisation roles
- Meath County CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
- An Coimisiún PleanálaAppealauthority · One or more appeal references are retained.
Location
Where the site is
- Area
- Ashbourne, Meath
- County
- Meath
Addresses on the notices
- Coach Ashbourne, Co
- Cherry Lane, Ashbourne, Co
- Cherry Lane, Ashbourne, County Meath
- Notice source points are up to 416 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.502503, -6.395899 Open point
- Public notice source · 53.502641, -6.396931 Open point
- Public notice source · 53.502547, -6.396527 Open point
- Public notice source · 53.502697, -6.392133 Open point
- Public notice source · 53.502780, -6.392165 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503016, -6.391586 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
- Public notice source · 53.503227, -6.390717 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official planning, scanned-file and appeal sources are available below.
Public application drawings are available for this notice group.
Use the official drawings or scanned files to review the submitted plans and elevations.
-
Architecture Drawings D2101.S.05 Overall Site Layout.pdf Listed on the exact official case page for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.Open official architecture drawing · external
-
Engineering Drawings 200059-DBFL-CS-SP-DR-C-1300-P01-Overall Site Services Layout.pdf Listed on the exact official case page for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.Open official engineering drawing · external
-
Official environmental report EIAR Volume I.pdf Listed on the exact official case page for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.Open EIAR document · external
-
Landscape Drawings 21659-3-100-revA Landscape Masterplan.pdf Listed on the exact official case page for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.View official drawings · external
-
Official associated document SHD Application Form.pdf Listed on the exact official case page for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.Open associated document · external
-
Official planning file Meath County Council planning record Application details, status and decision record for SH314550. Meath County Council Official link · last checked 30 Jul 2026 Exact official source shared from the planning and approval record.Open official planning record · external
-
Official SHD case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
-
Official decision document Inspector's report Listed on the exact official case page for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.Open inspector’s report · external
-
Official decision document Order Listed on the exact official case page for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.Open order · external
-
Official decision document Direction Listed on the exact official case page for ABP-314550-22. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.Open direction · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new five-storey development (Block B1),containing a Shell and Core Retail Unit and 57 No. Apartments with a ground floor car park at Coach Ashbourne, Co. Meath
Floor area stated for this source: 8,119 m².
Construction of a new six-storey development (Block A1), containing 92 No. Apartments, Shell and Core retail units over basement car park at Coach Ashbourne, Co. Meath.
Floor area stated for this source: 14,702 m².
Construction of a new three-storey residential unit comprising a ground floor apartment (Unit No. 73) and a duplex maisonette above (Unit No. 74). Address: Cherry Lane, Ashbourne, Co.Meath
Floor area stated for this source: 238 m².
Construction of a new three-storey residential unit comprising a ground floor apartment (Unit No. 49) and a duplex maisonette above (Unit No. 50).
Floor area stated for this source: 238 m².
Construction of a new three-storey residential unit comprising a ground floor apartment (Unit No. 72) and a duplex maisonette above (Unit No. 71). Address: Cherry Lane, Ashbourne, Co.Meath
Floor area stated for this source: 238 m².
Commencement of 128 No of houses at Cherry Lane, Ashbourne, Co. Meath
Floor area stated for this source: 14,904 m².
Commencement of 6 No of houses at Cherry Lane, Ashbourne, Co. Meath
Floor area stated for this source: 789 m².
Overall development total stated in source: 36 houses.
The development consists of the following : Non-residential facilities at the ground floor level consisting of childcare facility, a retail, and an either retail of cafe : undercroft car parks: and 23no apartments on the first floor to fourth and all associated site development works.
Floor area stated for this source: 3,845 m².
The development consists of a Three-Storey Building with 10 no. Apartments and Green roof on second and third floor and all associated site development works
Floor area stated for this source: 956 m².
Construction of a new Triplex apartment block 8, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 6, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 7, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 9, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 5, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 4, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 3, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 2, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 11, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
Construction of a new Triplex apartment block 10, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 353 m².
The development consists of a three-storey building with 3 no. 2-bed apartments and all associated site development works.
Floor area stated for this source: 352 m².
Construction of a new Triplex apartment block 12, at Cherry Lane, Ashbourne, County Meath
Floor area stated for this source: 335 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.